STANDARD WORK FORMULARall steps 4 WORKERS 2 WORKERS + ROBOT STEP DESCRIPTION STEP DESCRIPTION STEP DESCRIPTION OPERATION10 1 Presence control of the l...
9 downloads
25 Views
603KB Size
STANDARD WORK FORMULAR
ALL STEPS DESCRIPTION
OPERATION 10
STEP
1
Presence control of the lower mandrel in the nest
2
Presence control of the upper mandrel in the nest
3
Loading UF boot with clamp on the lower nest (left)
4
Boot presence control on the nest
5
Loading VL boot with clamp on the upper nest (right)
6
Boot presence control on the nest
7
Loading shaft to the nest and jaws
8
Control present shaft in the nest and jaws
9
RFID assembly
10
RFID reading
11
Start button
12
Lock shaft by jaw
13
Assembly boots and clamps on the shaft
14
Assembly UF circlip on the shaft
15
UF clamp positioning
16
18
UF clamp closing by Oetiker gun Closing force control during clamp closing and clamp presence control Return assembly heads to the start position
19
Return mandrel to the circlip feeder nest
20
Release part if OK
21
Start button
22
Loading circlip to the mandrel
23
Automatic transport to the next operation
17
4 WORKERS STEP
DESCRIPTION
2 WORKERS + ROBOT STEP
DESCRIPTION
OP 20 OPERATION 30 OPERATION 40
1 2 3 4 5 6 1 2 3 4 5
6
Loading join to the conveyor Joint inner race leveling Balls presence control in the joint Joint greasing Grease Quantity control Automatic transport joint in to the station 30 (in to the nest) Presence control of the upper head in the nest Presence control of the jaws in the nest Loading joint on the nest Control present joint in the nest Jaws closing and positioning on the joint Loading shaft to the nest and jaws
7
Control present shaft in the nest and jaws
8
RFID reading
9
Lock shaft by jaws (optional – if it is needed)
10
Centring and joint assembly with shaft
11
Control press force and position (Real time diagram)
12
Pull test
13
Control position and present assembled joint
14
Return assembly heads and jaws to the start position
15
Release part if OK
1
Presence control of the upper head in the nest
2
Loading big VL clamp on the boot
3
Loading shaft to the jaws
4
RFID reading
5
Loading and centring joint on the shaft
6
Control present joint in the nest
7
Control press force and position (Real time diagram)
8
Process cycle: PUSH – PUSH (without pull)
9
Control position and present assembled joint
10
Greasing (under the both boots)
11
Grease Quantity control
12
UF boot positioning on the joint
13
Release part if OK
OPERTION 50
1
Presence control of the lower mandrel in the nest
2
Presence control of the upper mandrel in the nest
3
Presence control of the lower MCR
4
Loading shaft to the nest and jaws
5
Control present shaft in the nest and jaws
6
RFID reading
7
All clamps positioning
8
Start button
9
Clamp crimping (MCR – UF big clamp)
10
Return assembly heads to the start position
11
VL small clamp closing by Oetiker gun Closing force control during clamp closing and clamp presence control VL big clamp positioning
12 13 14
16
VL big clamp closing by Oetiker gun Closing force control during clamp closing and clamp presence control Release part if OK
1
Loading half-shaft on the scale
2
Half-shaft presence in the station
3
RFID reading
4
Label applying
5
Label scanning
6
Weight control
7
Visual control
8
Release part if OK
9
Put on the PLATFORM
OPERATION 60
15
MÓJ i GKNu – BALANS LINII 20 WORKER ACT. 1
1
AUTO 1 AUTO
2
1
3
AUTO 1 AUTO AUTO AUTO
4
2
1
AUTO 2 AUTO
2 3
2 AUTO
4 5
2
5
AUTO 2 AUTO
5 6 5 1
3 AUTO 3 AUTO 3 AUTO
2 1 3 3 4 1 1
4 AUTO 4 4/AUTO 4
2 1 3 4 5 6
STANDARD STEPS Charging and loading boots, clamps and shaft + RFID assembly RFID reading Start button Assembly boot and clamps + cirlip UF clamp positioning and pressing button Clamp closing Release part + start button Loading circlip and automatic transport Joint greasing Loading joint on the nest Charging part form OP10 and loading to the nest RFID reading Centering and joint assembly with shaft AUTO CYCLE Release part WALK Loading to the nest RFID reading Loading and centering joint on the shaft AUTO CYCLE Start greasing AUTO CYCLE Release part WALK Loading shaft to the nest RFID reading All clamps positioning + start button AUTO CYCLE VL big clamp positioning + start button AUTO CYCLE Release part WALK Loading shaft RFID reading Label applying Supervision of AUTO CYCLE Visual control Release part and put on the platform
TIME [s]
STEPS
6
S1 - S9
0,5 0,5 3
S10 S11 S12 - S14
2
S15
3 1 8 3
S16 - S19 S20 - S21 S22 - S23 S1 - S6 S1 - S5
2
S6
1 2 8 2
S7 - S9 S10 S11 - S14 S15
3 1
S1 - S3 S4 S5
8 3 5 3
S6 - S9 S10 S11 - S12 S13
3 1 4 7 2 6 2
S1 - S5 S6 S7 - S8 S9 - S12 S13 S14 - S15 S16
4 1 3 7 7 5
S1 - S2 S3 S4 S5 - S6 S7 S8