Legend Extract grille Supply diffuser Attenuator Cross talk attenuator Fire/Smoke damper Volume control damper Notes 1. This drawing shall be read in ...
5 downloads
24 Views
3MB Size
Notes
13a 14a 14
15
1617
20 20a 21a 21
19
A
IRONING ROOM
1.
This drawing shall be read in conjunction with all other services, Architectural drawings, project specifications and contract documentation.
2.
All grilles and diffusers to have opposed blade dampers.
3.
All ductwork to DW144/DW172 (where applicable).
4.
Flex to be used only straight-all bends to be rigid.
5.
Fire dampers to be located in accordance with fire strategy drawing requirements.
6.
Access doors to be located adjacent to fire dampers and every 3m.
7.
All branch connections shall have VCD's.
8.
All diffusers and grilles to be supported by structure.
9.
In positions of restricted headroom, ducts may be supported with flat bar formed to duct shape with fixings at sides on bent lugs.
10.
All ductwork brackets to have an acoustic soft rubber or neoprene interface layer to the duct.
11.
All supply ductwork, including supply plenum boxes to be thermally insulated.
12.
All references to specific manufacturers are made for design specification purposes, installed equipment should be of equal standard and approved.
13.
All Heat Recovery Units to be fitted with 22mm condensate drains.
14.
All louvres to be 50% free area.
G162 3 M-354
B 31
32
?
?
?
?
350ø
B B
C C
D D E E
FF
G GH H
27.52
250Ø Supply duct set down
?
?
?
?
C
33
CORE 7 - LIFT SHAFT ++ 23.100 m + 22.974 22.900 m m CAPPING CORNICE LAYOUT (6TH) TOS PARAPET + 22.501 ROOF m + 22.100 Roof m LVL 7 - TOP OF CLT Level 7 - Roof FFL + 22.501m 4th floor TOS ENCLOSURES
34
D E
35
?
36
Legend
Roof Level
Extract ductwork Toilet extract ductwork
+ 20.305 m AHU floor BASE + 19.550 m 600x450 LevelLevel 6th CLT CORE Level 10 11 12 6 6 Roof
600x450 F
6th Floor
FFL FFL + + 19.600m 19.550m
?
?
?
?
Extract grille
19600
5
+ 18.125 m LANDING 13
M-354
37
Supply ductwork
22501
? ?
?
27.54
+ 16.649 m Level Level Level Level 10 11 12 13 14 15 23 24 5 16 4 5th FFL FFL FFL + 16.649m + 16.649m
38
Supply diffuser Level Level17 8 FFL + 16.649m
5th Floor
Level Level18 9 FFL + 16.649m
16649
G
Attenuator 39
?
40
Cross talk attenuator
?
Mechanical plant and main duct routes located above 5th floor rooms on roof space. Refer to 3D views and sections for further details.
?
? AHU2
18 18
Fire/Smoke damper Volume control damper
2000x1300 External Louvre
1000x600 Supply & Extract rises to higher roof level to serve 6th floor areas. For continuation refer to PA1064-M-361.
I
?
?
?
?
+ 20.305 m AHU floor BASE + 19.550 m 6th CLT CORE Level Level 10 11 12 6 Level 6 Roof
FFL + 19.600m 19.550m
6th Floor 19600
+ 18.125 m LANDING 13 J
?
?
?
?
LINEN ROOM
?
?
?
?
G140
250Ø Supply & Extract from above to below
+ 16.649 m 5th FFL
Level Level24 10 11 12 13 14 15 16 17 23 5 4 8 FFL + 16.649m
5th Floor 16649
DATA ROOM K
G139 52
49
48
44
L 250Ø Supply & Extract from above to below M
250Ø Supply & Extract from above to below
51
50
47
46
45
43
42
41
N
C5 C4
FR FR
04.10.17 05.06.17
General Update. Louvre Sizes Added.
C3
FR
08.05.17
External Condensers Added.
C2
FR
11.04.17
Xref Updated.
C1
FR
28.11.16
Construction Issue.
project
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
Moxy Heathrow
title O
scale
Proposed Ventilation Ceiling Void Co-ordination Layout 5th Floor Sheet 2 of 3 1:100 @ A1
date 14.10.2016
Key Plan
drawing no. PA1064
M-354
rev. C5