Outstanding Date: 04-09-17 Project: The Fox Restaurant 1.00 Items Actioned By Completion date Completed date 1.01 Replac...
9 downloads
27 Views
109KB Size
Outstanding Date: 04-09-17 Project: The Fox Restaurant 1.00
Items
1.01
Replace tiles on bar front and fit trims - Alan Richie has the trims Regrout Bar top and hav grout flush with tiles - Use grout to help with staining Bar drainage check all joints as to smelling and leaks Bar drainage fit connectors to drink sinks Mirror cracked replace - Drawing submitted to glass designs quote received awaiting for pro forma to be paid (Cordant) Replace canopy trim on ceiling with thicker trim - presently at 40 to 50mm requires 90mm trim (Material dropped off from our lock up to IBI) Kitchen marble worktop cracked requires fridge moving along and a leg fitting to prevent flexing of worktop Heat Recovery to have flow meter and temperature sensor fitted to check working efficiently, if not working efficiently remove unit. - Cylinder piped up incorrectly Boiler pipework to be checked and altered - check for valves and twin ports etc Kitchen radiator to be checked if from HRU pipework or boiler pipework Back of house Kitchen too cold look at options to keep warm Front kitchen cupboard doors loose and falling off - repair Male toilet door closer clashing with door - alter to suit Male toilet smelling check ventilation or maybe auto flushing on urinals Female toilet cubicle door knobs missing replace accordingly Male toilet tap fitted wrong and faulty replace accordingly - Mizu to supply Kitchen electrical circuit check for loadings and ways to prevent tripping Riser noise issue - look at fan mounts and sound insulation of duct. Riser doors insulate and seal Kitchen drainage - check fall is ok and repair leak behind Dry Store leak on waste Kitchen look at warming area up
1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22
2.00 2.01 2.02 2.03 2.04
O and M
Asset Log - (Bulbs, light fittings etc) Check as fitted drawings - For submittal to the landlord Cleaning statement for duct work in riser Cleaning access to pizza fan
Project Status Report
Actioned By
Completion date
Completed date
IBI
IBI
Cordant IGP
Complete
Complete
IBI
IBI
IBI
Ecovery
IGP
08/09/17
Cordant
Complete
Complete
Cordant IBI IBI
Cordant
06/09/17
06/09/17
IBI
IBI
Cordant
IBI IGP IGP Cordant
06/09/17 06/09/17
06/09/17 06/09/17
Cordant Cordant Cordant Cordant
1