5000l CHP Buffer Vessel MCP 6000l Indirect Hot Water Cylinder 6000l Indirect Hot Water Cylinder Cold Water Storage Tank Sprinkler Tank 1 Sprinkler Tan...
5 downloads
15 Views
3MB Size
99
400Dia Flue from Boiler and 125 Flue from CHP to rise through roof.
6089
LTHW Low Loss Header
Boiler 2
27.52
27.54
PLANT ROOM
PLANT ROOM
014
014
27.53 II
JJ
K K
Notes 1.
Please refer to; -PA1064-M-712 LTHW Plantroom Schematic -PA1064-M-711 Domestic Water Plantroom Schematic -PA1064-M-721 Chilled Water Plantroom Schematic -Specialist Sprinkler drawing for further details. all valving details, equipment details and pipework sizes.
2.
All pipework and valves to be insulated to BS requirement.
3.
Please refer to schematics and all manufacturer's literature prior to install.
4.
AAV's to be installed at all high points of pipework.
5.
DOC's to be installed at all low points.
6.
All pipework within the plantroom shall be fixed to the buildings structure via anti vibration mounts.
7.
Pipework within transformer rooms to be confirmed as acceptable.
8.
Contractor to provide electric tubular heaters in plantrooms for frost protection.
9.
All pumps to be fitted with anti vibration mounts.
Boiler 3
Boiler 1
01
H H
10 10
Section 01
Section 02
M-601
1000L 2No. 1000L Expansion Vessel to serve primary LTHW system
1000L
O O
N N
M M
LL
K K
JJ
II 27.53
27.54
27.52
H H
Pump 1 LTHW Pump to serve AHU's 5000l CHP Buffer Vessel
Pump 2 LTHW Pump to serve FCU's
5000l CHP Buffer Vessel
02 M-601
Pump 4 LTHW Pump to serve DHW PHE Pump 3 LTHW Pump to serve Bedroom PHE
PLANT ROOM CHP
014 MCP
Pump 14 LTHW/CHW Pump to serve Bedrooms FCU's Pump 13 CHW Pump to serve AHU's LTHW Plate Heat Exchangers
700L
CHW Plate Heat Exchangers 700L Expansion Vessel to serve change over system
PLANT ROOM
?
014
?
Section 03
Pump 12 CHW Pump to serve Change Over PHE Pump 11 CHW Pump to serve AHU's PHE 230L Expansion Vessel to serve primary CHW system Pump 10 CHW Pump to serve FCU's
230L
Cat 5 Break Tank and Booster Set CHW Low Loss Header Incoming CHW
? ? Sprinkler Tank 1
Sprinkler Tank 2
C2 C1
FR FR
04.10.17 05.05.17
Xref Updated. Construction Issue.
P1
FR
14.03.17
Preliminary Issue.
project
Moxy Heathrow Cold Water Storage Tank Cold Water Booster Set
6000l Indirect Hot Water Cylinder
6000l Indirect Hot Water Cylinder
title
scale
Mechanical Plantroom Layout
1:50 @ A1
date 14.10.2016
03 M-601
drawing no. PA1064
M-601
rev. C2