Detail A: Typical Detail of Vent Pipe Penetration through Roof Return flange on inside by others masks roof aperture. Fitted with intumescent fire dam...
8 downloads
14 Views
185KB Size
Notes
21a
22
23
24
20 20a 21a 21
22
23
2425
26
27
28
20 20a 21a 21
22
23
2425
26
27
28
20 20a 21a 21
22
23
24 25
1.
This drawing shall be read in conjunction with all other services, Architectural drawings, projectspecifications and contract documentation.
2.
This drawing should be read in conjuction with the rainwater drawings. Rainwater pipework by others.
3.
The sanitary pipework installation must comply with The Building Regulations Approved Document H1 and the recommendations of BS EN 12056.
4.
All horizontal soil & waste pipework to be laid to a minimum fall of 1:40 unless stated otherwise.
5.
All soil & vent pipework and fittings (with exception of soil and waste floats) shall be uPVC manufacturedin accordance with the recommendations BS 416
6.
The W.C soil floats shall be unplasticised polyvinyl chloride manufactured in accordance with the recommendations of BS 4514 together with the latest amendments.
7.
The waste floats from vanity basins, wash hand basins, urinals, sinks and all other relevant sanitary appliances shall be manufactured in accordance with the recommendations of BS 5255 together with the latest amendments.
8.
Rodding eyes to be used on every change of direction.
9.
All soil and waste pipework is to be installed in strict accordance with the manufacturers guidelines.
10.
This drawing only displays above ground drainage and their associated pop ups and not incoming duct positions. Please refer to associated drawings for further information.
11.
All exposed pipework to be boxed in and lagged.
28 26
27
28
AA
A
A
110Ø SVP terminates through roof cowl. Refer to Detail A.
BB
B
B
C
C DD
D
E
D E
Legend
110Ø SVP terminates through roof cowl. Refer to Detail A.
SVP SS RE FG AAAV
F
F
Soil vent pipe Stub stack Rodding eye Trapped floor gully Automatic air admittance valve Drainage services Additional drainage requirements as per Apto layout
G HH
H
G H
110Ø SVP terminates through roof cowl. Refer to Detail A. II J
J
I
I
J
JJ
110Ø SVP terminates through roof cowl . Refer to Detail A.
KK
K
K
LL
L
L
M M
M
M
NN
N
N 110Ø SVP terminates through roof cowl . Refer to Detail A.
C2
SS
02.05.17
Updated Inline with Clients Comments.
C1
FR
28.11.16
Construction Issue
project O O
O
Moxy Heathrow
O
title 20 20a 21a 21
20 20a 21
22
23
24 25
26
25
26
27
26.1
27
28
27.1
scale
Proposed SVP Penetrations Roof Level Sheet 3 of 3
1:100 @ A1
date 25.11.2016
Weathering apron 350dia Opening Return flange on inside by others masks roof aperture.
Fitted with intumescent fire damper to maintain fire protection integrity. Detail A: Typical Detail of Vent Pipe Penetration through Roof
Key Plan
drawing no. PA1064
M-473
rev. C2